Power and wiring
Battery, plug-in, low-voltage, and line-voltage systems have different access, code, and service requirements.
Mechanical installation
The motor and idler ends must be placed correctly, brackets level, and fabric clear of trim and hardware.
Programming
Upper and lower limits, preferred positions, channels, groups, bridges, and scenes should be documented.
Commissioning
Every control path should be tested, including remote, wall control, app, automation, and manual override when provided.
Professional checklist
- Confirm motor and shade labels
- Verify power before mounting
- Set and test limits
- Name rooms and groups consistently
- Record bridge and integration details
- Provide charging and service instructions
Common questions
Who should program smart-home integration?
The shade installer and integrator should coordinate responsibilities.
Can a battery shade be installed before charging?
Follow the manufacturer’s instructions; adequate charge is needed for setup and testing.
Why is documentation important?
It prevents future service from becoming guesswork.